pressure vacuum relief valve and gas holder inspections

 

Project - Pressure Vacuum Relief Valve and Gas Holder Inspections Utilising Full Breathing Apparatus

Client – Dwr Cymru Welsh Water

Location – All Dwr Cymru Welsh Water anaerobic digestion facilities.

Date – Spring/Summer 2017

Marches Biogas has several engineers qualified to work with full breathing apparatus and escape sets when undertaking work where there is likely to be a dangerous atmosphere.  

During 2017 the full breathing apparatus has been used on many occasions and across multiple sites for Dwr Cymru Welsh Water (DCWW).  As part of their statutory maintenance programme DCWW ensure that the digester pressure vacuum relief valves and gas holders are regularly inspected to maintain plant safety.  

DCWW commissioned Marches Biogas to carry out the inspections, when inspecting pressure vacuum relief valves the full breathing apparatus is required for the initial isolation of the valve to ensure full isolation without creating a wider zoned area. This initial work ensures the full inspection can be carried out safely without the need for the breathing apparatus.  Where internal gas holder inspections were carried out, the engineer entering the gas holder was required to wear the full breathing apparatus throughout the inspection.

 

 back to case studies

As part of their statutory maintenance programme DCWW ensure that the digester pressure vacuum relief valves and gas holders are regularly inspected to maintain plant safety.

Statutory Maintenance of Sewage Sludge Digesters

Are you a Water Authority who requires statutory maintenance of key sludge digester components including:

  • Biogas Boilers
  • Pressure Vacuum Relief Valves
  • Surplus Gas Burners
  • Gas Holders

Contact us to discuss your statutory maintenance requirements.

contact us